No one logged in. Log in
Orana Engineering Townsville

PROJECT SEARCH




Project ManagementProject Management

At Orana Engineering, project management is about delivering high quality outcomes for our clients.  Our experienced Project Managers coordinate all aspects of a project to ensure the client’s targets are consistently achieved.  Managing the core elements of cost, quality and schedule, successful project management realises the right balance and manages conflicts between each one.

Also of great importance for successful project management is the understanding of the client’s needs and expectations. Orana Engineering’s Project Managers have a unique skillset to draw upon with their combination of site experience, practical backgrounds and engineering qualifications allowing them to truly understand our clients' needs and expectations and create outcomes that align with this, meeting all key HSEC, quality assurance, cost and schedule targets throughout the process.....Read more | Show less

In the role of Project Manager, Orana Engineering has the experience and resources to:

  • Co-ordinate various work groups and organisations;
  • Schedule and co-ordinate regular meetings;
  • Manage project variations;
  • Promote and enforce client HSEC requirements;
  • Prepare and track project schedules;
  • Communicate project matters to all relevant parties;
  • Schedule permits and outages;
  • Prepare project reports; and
  • Track budgets, budget forecasting and cost control.

Engaging our project management services ensures that all aspects which effect the delivery of a project are the responsibility of our Project Managers, including resolving commercial issues, tendering and liaising with subcontractors, risk management and HSEC issues, commissioning and handover.  Personnel have access to a wide range of tools, procedures and processes that have been developed and refined by Orana Engineering to ensure effective cost estimation, management of budgets and change management.

Our project management services are of value throughout all stages of a project, from concept design through to detailed design, construction and handover.  An experienced Orana Engineering Project Manager adds value to a project by:

  • Dedicating a resource to manage the project, freeing up the time of the client so they can focus on the day to day operational issues;
  • Allowing clients to remain informed and be in control of the project without having to dedicate the time managing the details;
  • Providing the potential to achieve the highest quality outcome by engaging a practical Project Manager that has the time, expertise and experience to do the job right.  Orana Engineering’s Project Managers are skilled engineers with hands on site experience;
  • Seamlessly integrating additional services as required such as Client Engineer, design drafting, drawing revisions and drawing management giving clients one point of contact for any mechanical, electrical, structural or control systems engineering services requirements; and
  • Offering the confidence of an experienced project management service with a proven track record.

An added advantage of being a smaller organisation is that for larger projects (i.e. >$2.5M), we can act on behalf of the client in the role of Project Manager and/or Client Engineer without a conflict of interest, as Orana Engineering do not tend to pursue design works for larger engineering projects.

Orana Engineering has a proven track record ensuring outcomes are consistently achieved and has project managed projects with values in excess of $20M.  Our reliable Project Managers are technical experts and bring a depth of knowledge and experience to every project.

Contact Orana Engineering for further information about our project management services or to request a no obligation proposal. Our Capability Statement is also available for download providing more information about the services Orana Engineer offers. 

Contact Us

Orana Engineering Project Management

Reagents Lightning Protection

To ensure the CHPP reagent tank farm lighting protection systems were adequate and complied with Australian standards, Moranbah North requested Orana Engineering undertake a review and design for an upgrade of the lightning protection systems (LPS) installed for the tank farm area. more


Sewage Treatment Plant Refurbishment

To increase productivity as well as maintaining compliance with current legislative standards, Glencore Coal employed the services of Orana Engineering to design, manage and oversee the installation of the electrical portion of their sewage treatment plant upgrade. more


UG Conveyor Installations - MG Mechanical Installation

Detailing the installation of mechanical equipment and conveyor structure is one of the final steps for completing a maingate drive-head design. Installations designed by Orana Engineering (MG32, MG33, MG33C, MG34, MG35 & MG36) for Glencore’s Oaky No.1 underground coal mine typically detail the arrangement of drives, transfer stations, take-up units, maintenance equipment and overhead structure to support the carry belt. more


UG Conveyor Installations - MG Civil Installation

The site engineers at Glencore’s Oaky No. 1 underground coal mine have requested the assistance of Orana Engineering to determine the extent of the civil work required to effectively utilise the drive-head equipment in newly mined chambers for conveyor installations for MG32, 33, 33C, 34, 35 & 36. more


Wall Kit Drafting

BHP Billiton Cannington Mine is a significant underground Silver and Lead mining operation located in Western Queensland. Following completion of the ore extraction from each stope, paste backfill is used to fill the open void, which stabilises the area and allows for mining of adjacent stopes. This is achieved by constructing a fill wall across roadways, which provides a stable wall for areas that are being back filled, eliminates intrusion from back filled areas, and allows the back filling to achieve a higher density. more


Tippler Refurbishment Feasibility

The Glencore Port Operations in Townsville operate an export facility for minerals concentrate and refined copper within the Port of Townsville precinct. The concentrate in-loading rotaside tippler has been identified as being at end of life and a feasibility study was commissioned in order to review the like-for-like replacement option for refurbishment of the tippler, considering the increased demand on the tippler moving forward. more


MG07 Conveyor – Development Conveyor

Carborough Downs Coal Mine is an underground operation located in Central Queensland that utilises conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Designing a conveyor installation involves 3 major stages: the drive-head chamber design, the civil design, and the mechanical arrangement design. more


MG07 Conveyor – Civil Design

Carborough Downs Coal Mine is an underground operation located in Central Queensland that utilises conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Designing a conveyor installation involves 3 major stages: the drive-head chamber design, the civil design, and the mechanical arrangement design. more


MG08 Development Conveyor

Carborough Downs Coal Mine is an underground operation located in Central Queensland that utilises conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Orana Engineering was engaged by Carborough Downs to design a new longwall drive-head chamber and conveyor installation. more


UG Conveyor Installations - MG Chamber Design

Mining and transporting millions of tonnes of raw material every year requires significant infrastructure and planning for future works. The site engineers at Glencore’s Oaky No. 1 underground coal mine have engaged Orana Engineering on multiple occasions (MG33C & MG34) to design new conveyor drivehead excavations (chambers) to install conveyor drivehead equipment for development and longwall coal mining. more


Combabula Bore Pump

Prime Pump Company was contracted by Origin Energy and Laing O’Rourke to supply an upgraded bore pumping system at an existing bore site at the Origin Energy Combabula site. RIE Services was contracted by Prime Pump Company to provide supply and installation of the electrical components for the upgrade. more


MG07 Conveyor – Chamber Design

Carborough Downs Coal Mine is an underground operation located in Central Queensland that utilises conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Designing a conveyor installation involves 3 major stages: the drive-head chamber design, the civil design, and the mechanical arrangement design. more


Cyanide Tank Upgrade

In recent years Orana Engineering has enjoyed a productive relationship with Resolute Mining Ltd through its subsidiary Carpentaria Gold by undertaking several projects at their Ravenswood site. Sodium Cyanide is a very toxic compound used on site to recover gold from prepared ore. It is potentially lethal to humans and animals and can be extremely detrimental to the environment. more


Sag Mill Cover

BHP Billiton Cannington Mine, located in North West Queensland is a significant miner and exporter of Silver and Lead concentrate via the Port of Townsville. Orana Engineering was engaged by Cannington site maintenance to provide workshop fabrication drawings for a replacement cover to address the issue of corrosion that was present around flanges and access openings on the existing Sag Mill Trommel Sump Cover. more


Fire System Drawings

Accurate fire services and emergency resource drawings are important to ensure that the appropriate information is available to mine site based operations and emergency personnel. Orana Engineering was engaged by Oaky Creek Coal to assist in creating a set of fire system drawings throughout the surface operations to ensure they were up to date and relevant. more


Inner Bypass Valves

Orana Engineering was engaged by MMG’s Century Mine in Western Queensland to investigate and design an upgrade within the concentrator to increase flow from a flotation cell to a tailings trough. more


Redraw Electrical Drawings

To ensure plant maintainability and personnel safety, Dyno Nobel employed the services of Orana Engineering to redraw its low voltage (LV) and high voltage (HV) single line diagrams (SLD) whilst also confirming the drawings accuracy and functionality. more


Heavy Vehicle Washdown Facility

MMG’s Karumba Port Facility engaged Orana Engineering to design a heavy vehicle washdown facility to assist with management of concentrate for vehicles and machines used onsite. The project time frame was very short due to operational requirements, whereby Orana Engineering had to work from concept to IFC drawings within 7 days. Orana Engineering’s quality assurance system allowed the design to be completed quickly whilst ensuring a high level of quality for our client. more


UG Conveyor Installations – MG32 Tripper Mechanical Design

In high capacity longwall conveyor arrangements, the installation of a tripper will typical occur after the chamber has been fully developed. The installation designed by Orana Engineering for MG32 conveyor for Glencore’s Oaky No.1 underground coal mine detailed the arrangement of the tripper drives, brakes, pulley frame and load station. more


FB-028 Tank Lifting Beam

During an upgrade to the Concentrator at MMG’s Century Mine located in Western Queensland, Orana Engineering was engaged to design a lifting beam for the installation of a new flotation cell. more


Mill Gear Box Frame

The IMT project team at MMG’s Century Zinc operations enlisted the assistance of Orana Engineering to produce a set of fabrication drawings for an existing gear box frame which required replacing. Although the frame itself had been in operation for quite some time, there were no detailed drawings available that could be used for the construction of a replacement unit. more


Ball Mill #2 Recommissioning

Eloise Copper Mine (ECM) had a requirement to recommission their No.2 Ball Mill. During the process of the recommissioning works it was identified that a means to relocate the grinding media to the feed chute needed to be designed and engineered with RPEQ certification. more


Jaw Crusher Platform

Eloise copper mine is an underground mining operation producing copper concentrate for export. The maintenance department of Eloise Copper Mine contacted Orana Engineering with a specific requirement for the design of an access platform for their jaw crusher including engineering certification and drafting. The client provided Orana Engineering with site measurements and a basic concept of the design they were looking for. more


Flotation Cell Upgrade

In an effort to increase the efficiency of their concentrator, Eloise Copper Mine enlisted the services of Orana Engineering to provide engineering and design assistance for the installation of 3 new copper concentrate scavenger cells, within the existing processing plant. more


Crusher Circuit Upgrade

Eloise Copper Mine had purchased a new Metso TS4.2 dual deck vibrating screen to replace the existing smaller screen and a second Omnicone cone crusher to provide a secondary crushing circuit to increase their production and improve operational efficiencies. more


Onsite Accommodation Camp Services

Orana Engineering was engaged by Oaky Creek Coal Mine in Central Queensland to assist with the design and construction of an onsite accommodation camp on the mine lease, including primarily the HV substation for power supply and potable water storage & supply. more


Redraw Dragline DL007 Drawings

To improve the maintainability of plant electrical systems and personnel safety, Hail Creek Mine employed the drawing revision services of Orana Engineering to redraw all electrical power, control and termination diagrams associated with its Dragline 7 (DL007) into AutoCAD format more


MIBC & Diesel Upgrade

The purpose of the Reagent System Upgrade project at Oaky Creek was to install new reagent storage tanks, discharge/ delivery pumping system and automated flow control distribution manifolds for the delivery of each reagent to the nominated process connections. In the event of failure of the automated flow control system, rotameters for manual reagent addition were included as a contingency. more


10M TAGS Sled

At James Cook University, MBD Energy operates a research facility investigating methods of cultivating and harvesting algae. To allow the scientists to better control the algae agitation sleds, MBD Energy engaged the services of Orana Engineering to design and commission the mechanical, electrical and control systems that would enable the agitation sled velocity and frequency of travel to be automated. more


Tank Static Line

All mine and industrial sites will list safety as their highest priority within their day to day operations. In line with this philosophy, management at Carpentaria Gold’s Ravenswood Operation enlisted the assistance of Orana Engineering to design a fall arrest system that could be easily removed and repositioned above the multiple leach tanks on site to allow for the safe removal and servicing of tank agitators. more


22M Flyover Conveyor

Oaky Creek Coal engaged Orana Engineering to perform the electrical and control system engineering design for the 22M Flyover Conveyor. The new conveyor provides an interface between two existing conveyor systems. more


Gold Slurry Sampler

Orana Engineering was engaged to design a new sampling equipment installation to improve sampling effectiveness at Carpentaria Gold’s Ravenswood operations. more


TK102 Bypass Piping

When tasked with a major repair to one of their leaching tanks, operations staff at Carpentaria Gold’s Ravenswood Operations enlisted the assistance of Orana Engineering to develop a solution that would allow for process operations to continue whilst leaching tank TK102 was out of service. more


Water Polishing Plant Access Platform

The BHPB Cannington Port Storage Facility located at the Townsville Port operates a Water Polishing Plant for the treatment of site stored water. The Water Polishing Plant Filtration system requires regular maintenance in order to replace Filtration Rods. With the Filter Bank maintenance ports being at a level that cannot be accessed from ground level, it was necessary to arrange work platforms to perform this maintenance. more


UG Conveyor Installations – MG32 Tripper Civil Design

The site engineers at Glencore’s Oaky No. 1 underground coal mine have engaged Orana Engineering to determine the extent of the civil work required to install the maingate tripper equipment in MG32 longwall conveyor. more


Underground Workshop Concept Design

Due to expanding operations, Oaky North underground operations considered that there could be benefit to having an underground workshop including refuelling stations to reduce vehicle travel times and increase efficiencies of vehicle movements. Orana Engineering was engaged to provide concept design and estimating assistance for internal project approvals. more


Crane Lifting Beam

The mother beam of the 40T ship loading crane at the Port of Townsville had been in service for over 30 years and was nearing the end of its service life. With regulatory compliance changes and much improved safety practices in the past 30 years, Xstrata Copper (now Glencore) engaged Orana Engineering to redesign the mother beam based on the existing beam and incorporating required changes to meet the current compliance requirements. This was also an opportunity to improve the current design by incorporating feedback from the crane operators and maintenance personnel. more


UG Conveyor Installations – MG32 Tripper Chamber

Maingate roadways mined to accommodate longwall conveyors at Glencore’s Oaky No. 1 underground coal mine can vary from a few hundred meters to over 4 kilometres in length. Transporting vast quantities of coal over long distances requires a significant amount of power. In some cases the drive-head power is insufficient or is constrained by the allowable belt tension and an additional drive/ power source is required to meet the required operating capacity. Commonly this additional power will come in the form of a driven conveyor tripper installed at a nominal point along the conveyor, which requires the appropriate excavation for the tripper installation inclusive of drives, tripper frame, braking and belt starter. more


Tank Farm Upgrade

Melbourne Bio Diesel’s (MBD) James Cook University (JCU) research facility required an elevated level area to allow the installation of a series of tanks for the purpose of storing fresh sea water. Orana Engineering was requested to provide a design solution that not only increased efficiency with the tank draining but to also improve safety around the new tanks. more


Yokogawa DCS Upgrade

Orana Engineering has since 2005 provided 24/7 support for Oaky Creek Coal’s (OCC) control systems. At the Coal Handling & Preparation Plant (CHPP) OCC uses a Yokogawa DCS as the primary control system, which was originally installed in 1998. The system is very robust and the hardware, software and its configuration has proven to be very reliable and highly cost effective. more